Skip To Main Content

Asbestos Management Plan

Most older buildings and schools built before the early 1980s contain trace amounts of asbestos in building materials. If the building is properly surveyed and inspected, a management plan is in place, and the materials are encased and properly maintained, this does not present a problem to our visitors, students, or staff.

This notification is being made pursuant to the requirements of the Asbestos Hazard Emergency Response Act (AHERA) October 22, 1986; EPA Rule 40 CFR 763, Asbestos Containing Material in Schools, Subpart E, et seq. effective December 14, 1987. These are defined in the United States Environmental Protection Agency's regulations. Specifically, 40 CFR §763.84 requires that we notify you at least once a year of asbestos inspections, response actions, and any post-response action activities, including periodic re-inspections and surveillance activities that are planned or in progress at our campus. Please reference the information below to learn more about our compliance with these requirements.

We have developed and maintained an Asbestos Management Plan for managing and maintaining asbestos-containing building materials (ACBMs) in place and/or for their removal during future renovation activities. This plan includes documentation of all previous asbestos activities, as well as our plan for upcoming work.

The plan includes:
  • The initial asbestos inspection
  • Results of each 3-Year re-inspection
  • Documentation of each 6-month surveillance
  • The Asbestos Designated Person is our Life Safety Officer, Nicholas Trudeau
Over the past year, we completed the following asbestos-related activities:
  • Two six-month inspections of ACBMs
  • Removal of ACBMs
  • Compliance activities prescribed in our Asbestos Operations & Maintenance Plan
  • All Facilities staff are Asbestos Awareness Trained
For the remainder of this school year, we have the following activities planned:
  • Continue our six-month checks of the ACBMs
  • Continue removal of ACBMs
  • Our 3-year re-inspection
  • Maintain all ACBMs in good condition
  • Update Management Plan

Abatement of known ACBM will continue as needed contingent on building remodeling, retrofitting, and maintenance of disturbed ACBM. All removal projects are designed and implemented by qualified personnel. 
 

NEED MORE INFORMATION?
The Asbestos Management Plan is available for review in our Facilities Department. Should you have any questions or desire further information, please call 508–529–7758 x3070 or contact our Asbestos Designated Person at ntrudeau@valleytech.k12.ma.us.